Discuss a project
SYNERGY / SERVICES / CLEAN ROOMS

Start with the environment you need.

Evaluation, material selection, construction, additions, modifications, and maintenance for controlled environments.

01

Define the requirements

Identify the intended use, environmental criteria, layout, and any owner or project specifications.

02

Construction & modifications

Discuss new construction, additions, materials, interfaces with existing systems, and constraints within an operating facility.

03

Scope & specialist coordination

Confirm who is responsible for design, testing, commissioning, and any required validation. These responsibilities should be explicit in the project scope.

02 / PREPARE THE CONVERSATION

What to have
on hand.

Share what you know. Missing details can be discussed with the team.

  1. Intended use and project specifications
  2. Required temperature, humidity, pressure, and filtration criteria
  3. Available drawings and existing-space information
  4. Construction phasing and testing responsibilities

Capabilities

  • Evaluation of existing rooms and requirements
  • Material selection
  • Construction
  • Add-ons and expansions
  • Modifications
  • Maintenance

Systems

  • Modular clean room systems
  • Supporting HVAC and filtration
  • Controlled-environment industrial services
04 / COMMON NEEDS

Where controlled-
environment work begins.

Each starting point leads to a different scope.

  1. A new controlled environment for a manufacturing or process need.
  2. Expanding an existing room or adding space.
  3. Changing a layout, equipment, or process inside a room.
  4. Maintenance for modular rooms and their supporting systems.
  5. Preparing for the owner’s testing or validation activities.
01

Requirements and criteria

The owner defines the intended use and the cleanliness, temperature, humidity, and pressure criteria the room must meet. These drive every design and construction decision.

02

Design

Layout, materials, airflow, and supporting systems are developed around those criteria. Confirm which design responsibilities Synergy will hold and which sit with your engineers or architects.

03

Construction and modifications

Building or changing a room inside an operating facility needs sequencing, protection of adjacent areas, and coordination with production.

04

Testing, certification, and validation

Certification testing and validation are separate responsibilities, often carried out by the owner’s quality team or an independent specialist. Define who performs them, and to what standard, at the start.

05

Maintenance

Ongoing care covers the room and its supporting systems. Agree the tasks, intervals, and records your quality program requires.

06 / RELEVANT EXPERIENCE

A distinguishing part
of Synergy’s work.

Experience notes summarize Synergy’s published company history. Ask the team about references relevant to your project.

View project experience
CONTROLLED ENVIRONMENTS

Technimark

A clean room constructed for Technimark is listed among the most successful projects in Synergy’s company history.

CAPABILITY

Clean room construction

Synergy’s company history identifies clean room construction as a part of its work that sets it apart.

QUESTIONS, ANSWERED

Before you start.

Can we discuss modifying an existing space?

Yes. Share the current layout, intended changes, operating constraints, and applicable project specifications.

Does construction automatically include certification?

No. Testing, certification, and validation responsibilities must be defined separately in the agreed scope. Discuss those requirements at the start.

Does Synergy certify clean rooms?

This site does not claim certification services. Testing and certification are commonly performed by an independent party or your quality team. Discuss the responsibilities you need covered.

Can you modify a room that is already in operation?

Modifications are part of Synergy’s clean room capabilities. Describe the room, the change, and your production constraints so sequencing can be discussed.

Do you work with modular clean room systems?

Yes. Modular systems are listed among Synergy’s clean room capabilities.

What should I prepare?

Intended use, the criteria the room must meet (if defined), size and layout, existing drawings, current HVAC information, schedule, and any documentation your quality program requires.

KEEP EXPLORING

Related capabilities.

LET’S DEFINE THE NEXT STEP

Let’s talk about clean rooms.

Discuss a project